Day 5 of the remodelingSaturday, May 5, 2001 The roofers showed up at 9:30 this morning and were finished by 3:15 pm. Pool work began with the replacement of the skimmer and the installation of the vacuum line. No more vacuuming of the pool by hand (yippie!). We replaced the two gate valves at the pool pump with 2 3-way Jandy valves. The pool tile was also set and grouted today so that the deck could be formed in and poured next week.Click on the thumbnails to see larger images. |